Qube Development
Midora Residences is a residential development in Jumeirah Village Circle (JVC) with studios, one- to three-bedroom apartments and a two-bedroom duplex. The listed starting price is AED 619,300, with a listed handover in Q3 2027.
The listed copy describes a 'Live, Work, Play and Rejuvenate' concept and a design by Nikken Sekkei, with buildings arranged in a butterfly layout. Listed amenities include landscaped gardens, a swimming pool, a gymnasium, a kids play area, BBQ facilities, 24/7 security and restaurants and cafés.
Pricing and terms: listed from AED 619,300. Listed payment structure: 10% down, 50% during construction in 12 instalments, 40% on handover; DLD fee 4% (as listed). The developer's own price list is not published on the listing, so every figure here is to be confirmed in writing before you reserve.
The community: Circular, self-contained and full of parks, nurseries and cafés — the city's most active mid-market rental district.
Compiled October 2026 from listed information for this project (unit mix, sizes, amenities, payment plan and handover date as listed). The developer's own project page could not be verified for this entry, so prices and dates are listed figures and are to be confirmed with the developer in writing. Prices and availability move weekly; we confirm the live position before you reserve.
| Detail | Published | Source |
|---|---|---|
| Bedroom types | Studio–3 | As published |
| Size range | from 394 sq ft | As published |
| Property type | Apartment / Apartment/Duplex | — |
Layouts, remaining units and floor plans are confirmed with the developer before reservation.
10/50/40 (down/construction/handover)
As published. Instalment dates and late-payment terms sit in the reservation agreement.
Amenities as published by the developer. What is finished at handover is confirmed in writing.
Commute times and distances are checked at peak hours before we advise on a specific unit.
The published price is From AED 619,300 (listed). Pricing and availability move, so we confirm the current list with the developer before you reserve.
Published bedroom types: Studio–3. Individual layouts and floor plans are confirmed with the developer.
The listed handover is Q3 2027 (listed). We confirm the contractual date for your specific unit.
The published plan is 10/50/40 (down/construction/handover). Instalment dates and terms are set out in the reservation agreement.
Midora Residences is in Jumeirah Village Circle.
Midora Residences is developed by Qube Development.
One enquiry, answered by a person. Current price list, unit availability, handover status, service-charge estimate and our honest read on Jumeirah Village Circle — within one working day.