Deyaar Development
Alder at Park Five is the final phase of Park Five by Deyaar in Dubai Production City, Dubai, with one to three-bedroom apartments. The listing shows a one-bedroom unit from AED 1,100,000 (listed, to be confirmed), with handover in Q4 2027 as listed. Prices and the payment plan are to be confirmed with the developer before you reserve.
According to the listing, Alder at Park Five is a lakefront residential building by Deyaar Development with one, two and three-bedroom apartments of about 780 to 1,659 sq ft. The listing describes biophilic design, tri-level amenities and rooftop spaces, with a gym, pools, a kids' club and co-working stations. Deyaar describes Alder as part of the final phase of Park Five.
Pricing and terms: listed from AED 1.1M. Listed payment structure: 10% down, 35% during construction in 7 instalments, 55% on handover; DLD fee 4% (per the listing). The developer's own price list is not published on the listing, so every figure here is to be confirmed in writing before you reserve.
The community: Mixed-use district at the junction of Sheikh Mohammed Bin Zayed Road and Al Khail Road.
Compiled October 2026 from the listed details for this project (unit mix, sizes, amenities, payment plan and handover date as listed there). The developer's own project page could not be verified for this entry, so prices and dates are the listed figures and are to be confirmed with the developer in writing. Prices and availability move weekly; we confirm the live position before you reserve.
| Detail | Published | Source |
|---|---|---|
| Bedroom types | 1–3 | As published |
| Size range | from 780 sq ft | As published |
| Property type | Apartment | — |
Layouts, remaining units and floor plans are confirmed with the developer before reservation.
10/35/55 (down/construction/handover; listed, to be confirmed)
As published. Instalment dates and late-payment terms sit in the reservation agreement.
Amenities as published by the developer. What is finished at handover is confirmed in writing.
Commute times and distances are checked at peak hours before we advise on a specific unit.
The published price is From AED 1.1M (listed; to be confirmed). Pricing and availability move, so we confirm the current list with the developer before you reserve.
Published bedroom types: 1–3. Individual layouts and floor plans are confirmed with the developer.
The listed handover is Q4 2027 (listed). We confirm the contractual date for your specific unit.
The published plan is 10/35/55 (down/construction/handover; listed, to be confirmed). Instalment dates and terms are set out in the reservation agreement.
Alder at Park Five is in Dubai Production City.
Alder at Park Five is developed by Deyaar Development.
One enquiry, answered by a person. Current price list, unit availability, handover status, service-charge estimate and our honest read on Dubai Production City — within one working day.