Aldar Properties

Manarat Living II by Aldar

Manarat Living II is an apartment project in Saadiyat's cultural district, Abu Dhabi, with studios to three-bedroom homes. The listing gives a Q1 2027 handover.

Request the price list WhatsApp
Handover
Q1 2027 (listed)
Payment plan
10/55/35 (down/construction/handover)
Bedrooms
Studio–3
Type
Apartment
Size
from 355 sq ft
Status
Off-plan
Community
Saadiyat Island
Price
From AED 830,000 (listed)

About Manarat Living II by Aldar

The listing describes Saadiyat Island as Abu Dhabi's cultural district, minutes from the Louvre Abu Dhabi, the Guggenheim Abu Dhabi and the Zayed National Museum. Plans run from a 355 sq ft studio to a 2,302 sq ft three-bedroom on the listing. Amenities include adult and kids pools, an infinity pool, a gym, a sports court, a kids play area, dining outlets, a supermarket and a spa.

Pricing and terms: listed from AED 830,000. Listed payment structure: 10% down, 55% during construction in 5 instalments, 35% on handover; DLD fee 4% (per the listing). Aldar's own price list is not published on the listing, so every figure here is to be confirmed in writing before you reserve.

The setting: Saadiyat Island is Abu Dhabi's cultural district. The Louvre Abu Dhabi, the Guggenheim Abu Dhabi and the Zayed National Museum are on or near its shore, with beaches, protected mangroves and a marina district that includes NYU Abu Dhabi.

Compiled October 2026 from the listed details for this project (unit mix, sizes, amenities, payment plan and handover date as listed there). Aldar's own project page could not be verified for this entry, so prices and dates are the listed figures and are to be confirmed with the developer in writing. Prices and availability move weekly; we confirm the live position before you reserve.

Unit types and sizes

Detail Published Source
Bedroom types Studio–3 As published
Size range from 355 sq ft As published
Property type Apartment —

Layouts, remaining units and floor plans are confirmed with the developer before reservation.

Payment plan

10/55/35 (down/construction/handover)

As published. Instalment dates and late-payment terms sit in the reservation agreement.

Amenities

24/7 Security SurveillanceDining OutletsFitness CentreGymnasiumKids Play AreaAdult and Kids PoolsInfinity PoolAmusement ParkParks and Leisure Areas

Amenities as published by the developer. What is finished at handover is confirmed in writing.

Where it is

  • Community — Saadiyat Island
  • Developer — Aldar Properties
  • Status — Off-plan

Commute times and distances are checked at peak hours before we advise on a specific unit.

At a glance

  • Studio to three-bedroom plans, 355 to 2,302 sq ft (listing)
  • Infinity pool and adult and kids pools (listing)
  • Cultural-district location near the Louvre Abu Dhabi (listing)

What we verify before you reserve

  • The current price list and unit availability, from Aldar in writing: the figures here are listed prices, and several plans show 'ask for price'.
  • The payment plan for your unit (10% down, 55% during construction in 5 instalments, 35% on handover) and the completion date in the sale agreement, checked against the RERA registration and the escrow account.
  • The construction stage against Aldar's own project page and handover notice, plus the unit exactly as sold: floor, orientation, view, service-charge estimate.
  • Whether the listing's amenity list is what will be delivered, and by when, in the approved master plan.

Manarat Living II by Aldar: frequently asked questions

How much does Manarat Living II by Aldar cost?

The published price is From AED 830,000 (listed). Pricing and availability move, so we confirm the current list with the developer before you reserve.

What unit types are available at Manarat Living II by Aldar?

Published bedroom types: Studio–3. Individual layouts and floor plans are confirmed with the developer.

When is handover at Manarat Living II by Aldar?

The listed handover is Q1 2027 (listed). We confirm the contractual date for your specific unit.

What is the payment plan at Manarat Living II by Aldar?

The published plan is 10/55/35 (down/construction/handover). Instalment dates and terms are set out in the reservation agreement.

Where is Manarat Living II by Aldar?

Manarat Living II by Aldar is in Saadiyat Island.

Who is the developer of Manarat Living II by Aldar?

Manarat Living II by Aldar is developed by Aldar Properties.

Ask about Manarat Living II by Aldar

One enquiry, answered by a person. Current price list, unit availability, handover status, service-charge estimate and our honest read on Saadiyat Island — within one working day.

WhatsApp instead

Goes to Nasreen Sultana, Senior Property Consultant. We never sell your details.