Imtiaz Developments

Cove Edition 6

Cove Edition 6 is the sixth of Imtiaz's furnished Cove buildings in Dubailand Residence Complex, with a rooftop infinity pool, clubhouse, gym, outdoor dining and a kids' playground. Imtiaz's page gives a Q4 2027 completion and shows construction 26% along in October 2026, but publishes no unit mix or payment plan — the portal listing describes furnished studios, one- and two-bedroom apartments from AED 696,000, which we treat as unconfirmed.

Request the price list WhatsApp

Price
From AED 696K · portal, confirm
Type
Apartment
Bedrooms
Studio–1–2 (to confirm)
Status
26% built
Handover
Q4 2027
Payment plan
To be confirmed
Rooftop
Infinity pool
Community
DLRC

About Cove Edition 6

Cove Edition 6 follows the series format: a mid-rise furnished building with the leisure deck on the roof. Imtiaz's page lists a clubhouse, fully equipped gym, kids' playground, sitting area, BBQ area, rooftop infinity pool, outdoor dining and a meeting area, but no FAQ, unit schedule or configuration. The portal listing (2025) describes fully furnished studios, one- and two-bedroom apartments in a two-basement, ground-plus-11 building with a rooftop — plausible for the series, but developer confirmation is outstanding.

Pricing and terms: Imtiaz publishes no prices or payment plan for this phase; the portal listing (August 2025) quoted from AED 696,000. Sister buildings run 50/50 or 70/30 post-handover plans, and we would expect the same here, but we get it in writing. Completion is scheduled for Q4 2027; the tracker showed 26% overall in October 2026 (sub-structure 99%, super-structure 41%). DLD 4% extra.

The setting: Dubailand Residence Complex (DLRC) sits between Dubai Silicon Oasis and Global Village along Emirates Road (E611) and Al Ain Road (E66) — the emirate's most active sub-AED-1M apartment belt. Dubai Outlet Mall, Academic City and Silicon Oasis are the nearest hubs; IMG Worlds, Global Village and Downtown are 20–25 minutes by car. There is no metro and the district is still filling in, so buyers trade walkability and finished amenities for price and some of the strongest gross rental yields in the city.

Compiled October 2026 from Imtiaz Developments' page for this project (unit mix, configuration, amenities, payment plan, completion date and construction progress as published there) and cross-checked against brokerage portals, whose 2025 prices are noted where used. Prices and availability move weekly — we confirm the live position before you reserve.

Amenities recorded

Rooftop infinity poolClubhouse & gymOutdoor dining & BBQKids' playgroundMeeting area & sitting areasFurnished studios to 2-beds (portal — to confirm)

Why it stands out

  • Sixth Cove building — the series' established furnished formula at a Q4 2027 date
  • 26% built in October 2026; sub-structure complete
  • Unit mix, prices and plan not yet published by Imtiaz — we confirm before you reserve

What we verify before you reserve

  • The current price list and unit availability — from Imtiaz, in writing: the developer publishes no prices on most project pages and the portal figures date from 2025.
  • The payment plan actually on offer for your unit (Imtiaz runs several structures in parallel, some with post-handover instalments) and the completion date written into the SPA, checked against the RERA registration and escrow account.
  • The construction stage against the developer's own progress tracker, and what 'fully furnished' includes — furniture schedule, appliances, smart-home kit.
  • The exact unit, floor, orientation and view, the service-charge estimate, and whether short-term letting is permitted for the building.

Ask about Cove Edition 6

One enquiry, answered by a person. Current price list, unit availability, handover status, service-charge estimate and our honest read on DubaiLand Residence Complex — within one working day.

WhatsApp instead

Goes to Nasreen Sultana, Senior Property Consultant. We never sell your details.