Imtiaz Developments
Cotier House is Imtiaz's marina-front building on Dubai Islands — ocean-inspired curved architecture housing one-bedroom apartments, duplex suites, terrace houses and three- and four-bedroom penthouses, with a grand infinity pool, separate adult and family pools and a hotel-style lobby opening onto the marina promenades. Completion is scheduled for Q1 2027; construction was 52% along in October 2026.
Cotier House is pitched as a resort-style marina community: flowing curved façades, floor-to-ceiling glazing, open layouts and deep balconies framing marina and sea views. The collection is unusual for Imtiaz — one-bedroom apartments, duplex suites, terrace houses, three-bedroom penthouses and a few four-bedroom penthouses — with curated material palettes and furniture selections. Amenities: grand infinity pool, separate adult and family pools, fully equipped gym, sauna and steam, exclusive clubhouse, hotel-style lobby, landscaped leisure spaces, kids' playground and zone, jacuzzi, BBQ area and interconnected marina promenades.
Pricing and terms: Imtiaz publishes no prices; the portal listing (2025) quoted from AED 2.4M, which we check against the live list. The developer's page does not state a payment plan for this building — Imtiaz's other Dubai Islands projects run 20/40/40 — so we obtain it in writing. Completion is scheduled for Q1 2027; the tracker showed 52% overall in October 2026 (super-structure 99%, MEP 41%, finishing 32%), which makes early 2027 tight. DLD 4% extra.
The setting: Dubai Islands is Nakheel's five-island redevelopment of the former Deira Islands, just north of the Creek mouth — some 20 km of beach, the Dubai Islands Mall, beach clubs and marinas under construction, linked to Deira by the Infinity Bridge. The draw is new-build beachfront at a fraction of Palm Jumeirah prices with short-term letting generally permitted; the trade-off is that much of the island is still a construction site, with the full retail, hotel and marine-transport offer arriving in phases through the late 2020s. Dubai International Airport is 12–15 minutes by car, Downtown 20–25. Imtiaz puts Gold Souq metro at 10 minutes, the airport and Dubai Frame at 20 and Downtown and DWTC at about 24.
Compiled October 2026 from Imtiaz Developments' page for this project (unit mix, configuration, amenities, payment plan, completion date and construction progress as published there) and cross-checked against brokerage portals, whose 2025 prices are noted where used. Prices and availability move weekly — we confirm the live position before you reserve.
One enquiry, answered by a person. Current price list, unit availability, handover status, service-charge estimate and our honest read on Dubai Islands — within one working day.